Saturday, 29 June 2013

Progress Report 12

Telephone line

14 August 2012 

Installation of telephone pipe line by selected subcontractor. The service pipe line are installed by excavated the area for telephone pipe. All figure shows the process of the telephone pipe line installation. 


Figure 1: Service pipe

Figure 2: Excavate for service pipe 

Figure 3: Service pipe manhole

This process are done after a week, JC9C manholes are install before layering the pipe line. 

Aisyah Ibrahim 
20 August 2012

No comments:

Post a Comment