Progress Report 7

19 July - On going

Column

For this process rebar for column will be erected first then the form work. Form work must be erect accurately to make sure that the column are straight. The column concreted in two phase, only 12 column be concrete in one time because form tie to lock the form work not enough for all column.

Figure 1: Rebar for column

 
Figure 2: Erected column


Figure 3 : Front right area

Figure 4: Front left area

Figure 5: Back left area 